Case Study

Seamless Datacenter Lift and Shift for a Global Building Technology Leader

  • GSI: Leading Technology Company
  • Delivery Partner: TecTigers
  • Regions Covered: Asia (Singapore) and Europe (Berlin, Germany)

Brief Overview

Leading Technology Company, with TecTigers as the service delivery partner, executed a datacenter lift and shift project for a global leader in building technology and solutions. The project involved relocating over 50 devices from a datacenter in Singapore, Asia, to a new facility in Berlin, Germany. TecTigers conducted detailed site surveys, handled decommissioning, packaging, logistics, installation, and testing, achieving 100% SLA compliance and ensuring minimal disruption to operations.

Fast Facts

Devices Relocated
0 +

Source Datacenter: Singapore, Asia

SLA Compliance
0 %

Destination Datacenter: Berlin, Germany

Key Tasks:

  • Site Survey
  • Decommissioning
  • Packaging
  • Logistics
  • Installation
  • Testing

Client Challenges

  • Critical Device Relocation: Moving essential datacenter devices with zero tolerance for damage or downtime.
  • Precise Coordination: Ensuring the logistics, decommissioning, and installation processes were executed seamlessly across locations.
  • Minimized Downtime: Relocating 50+ devices without impacting the client’s critical building technology services.
  • Testing and Readiness: Verifying device functionality and network readiness post-installation to ensure smooth operations.

Solution Delivered by TecTigers

    1. Detailed Site Survey
      • Conducted comprehensive assessments at both the source datacenter in Singapore and the destination datacenter in Berlin to plan the lift and shift effectively.
    2. Efficient Decommissioning and Packaging
      • Safely decommissioned and securely packaged over 50 devices to prevent damage during transit.
    3. Streamlined Logistics Management
      • Coordinated transportation between Asia and Europe, ensuring timely delivery.
    4. Seamless Installation and Testing
      • Installed devices at the destination datacenter and conducted thorough testing to validate operational readiness.
    5. SLA Excellence
      • Delivered all services within the agreed timelines, achieving 100% SLA compliance.

Key Outcomes

  • Successful Device Relocation
    • Transferred over 50 critical devices between datacenters with zero incidents or damage.
  • Operational Continuity
    • Ensured seamless transitions with no disruption to the client’s building technology operations.
  • Efficient Execution
    • Completed the project on time, adhering to the highest standards of quality and safety.
  • Scalability
    • Established a reliable framework for future lift and shift projects across multiple locations.
  • Client Satisfaction
    • Delivered a smooth relocation process, exceeding client expectations with 100% SLA compliance.

TecTigers demonstrated exceptional expertise and precision in executing our datacenter lift and shift project. Relocating over 50 critical devices from Singapore to Berlin without any incidents or downtime was a remarkable achievement. Their meticulous planning, secure decommissioning, and streamlined logistics ensured the project was completed on time and exceeded our expectations. Achieving 100% SLA compliance reflects their commitment to excellence. TecTigers has set a new standard for reliability and efficiency, and we look forward to partnering with them on future projects.

— Global IT Infrastructure Manager, Leading Technology and Solutions Industry