Brief Overview
Leading MNC, with TecTigers as the service delivery partner, successfully executed a two-phase office space move, relocating over 1,500 EUC devices and 65+ network devices from London to Manchester, UK. The project involved site assessments, structured cabling, connectivity testing, comms room setup, and end-to-end IT equipment relocation. Achieving 100% SLA compliance, TecTigers ensured a seamless transition with minimal operational disruption, delivering a fully functional workspace in the new location.
Fast Facts
Key Tasks:
- Site Survey
- Structured Cabling
- Connectivity Testing
- Comms Room Setup
- Decommissioning
- Packaging and Logistics
- Installation and Testing
- Disposal
Client Challenges
- Multi-Phase Move Management: Coordinating a two-phase move to relocate both EUC and network devices while maintaining business continuity.
- Infrastructure Readiness: Preparing the new office site in Manchester with structured cabling, network connectivity, and comms room setup.
- Equipment Security and Accuracy: Ensuring the safe and precise relocation of over 1,500 EUC devices and 65+ network devices.
- SLA Adherence: Meeting a strict 100% SLA compliance target for timely completion and minimal disruptions.
Solution Delivered by TecTigers
- Detailed Site Assessments
- Conducted thorough evaluations of both the London and Manchester locations to plan logistics and infrastructure requirements.
- Structured Cabling and Connectivity Setup
- Installed and tested structured cabling and network connectivity at the new office to ensure readiness.
- Secure IT Equipment Relocation
- Decommissioned, securely packaged, and transported over 1,500 EUC and 65+ network devices to the new location.
- End-to-End Project Management
- Coordinated vendors and managed logistics to deliver a smooth and efficient transition.
- Post-Move Support
- Provided on-site testing and troubleshooting to ensure all devices and systems were fully operational post-move.
Key Outcomes
- Seamless Transition
- Relocated all devices and infrastructure with zero disruption to the client’s operations.
- Infrastructure Readiness
- Delivered a fully operational workspace in Manchester, including structured cabling and comms room setup.
- 100% SLA Compliance
- Met all project timelines and requirements, achieving a perfect SLA compliance rate.
- Efficient Multi-Phase Execution
- Completed the relocation in two well-coordinated phases to ensure continuity and efficiency.
- Enhanced Client Operations
- Enabled the client to resume normal operations immediately post-move in the new office location.
TecTigers made our office space move from London to Manchester a seamless experience. Their meticulous planning, structured cabling expertise, and secure equipment relocation ensured zero disruption to our operations. Completing the project in two efficient phases while maintaining 100% SLA compliance was a remarkable achievement. Their commitment to precision and post-move support has greatly enhanced our confidence in managing such large-scale transitions. TecTigers has been an outstanding partner throughout the process.
— Facilities Manager, Internal Operations